Q61
Error location and repair is
  • A System modeling process
  • B System design process
  • C System verification process
  • D System decomposition process
Answer: Option C
Q62
Quality plan describes
  • A Quality prcedure and standards
  • B Approaches, resources ad schedules
  • C Configuration management and structure
  • D None of these
Answer: Option A
Q63
Which one is not true for risk analysis /
  • A It estimate risks
  • B it removes risks
  • C It reduces risks
  • D it develops risks
Answer: Option D
Q64
Project schedule can be illustrated in
  • A Bar-charts
  • B Activity-networks
  • C Figures
  • D None of these
Answer: Option D
Q65
Change in technology is a
  • A Technology risk
  • B People
  • C Tool risk
  • D Implementation risk
Answer: Option A
Q66
Change in technology is a
  • A Technology risk
  • B People
  • C Tool risk
  • D Implementation risk
Answer: Option A
Q67
Under estimate of ost is
  • A Technology risk
  • B People
  • C Estimation risk
  • D Organizational risk
Answer: Option C
Q68
Maintenance plan describes
  • A Quality procedure
  • B Schedule procedure
  • C Maintennce procedure
  • D Configuration procedure
Answer: Option C
Q69
Failure of schedule is
  • A People risk
  • B Organizational risk
  • C Estimation risk
  • D Requirement rik
Answer: Option C
Q70
Risk planning involves
  • A Avoidance strategies
  • B Minimization strategies
  • C Contingency plan
  • D All the above
Answer: Option D