Q51
 Validation plan describes the approach ,resources and schedule used for system validation
  • A True
  • B False
Answer: Option A
Q52
Integration, It will come under
  • A CMM Level 1
  • B CMM Level 3
  • C CMM Level 2
  • D None
Answer: Option B
Q53
Types of quality tools are Problem Identification Tools and Problem Analysis Tools.
  • A True
  • B False
Answer: Option A
Q54
Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself
  • A Water falls model
  • B Spiral Model
  • C V-model
  • D Linear model
Answer: Option C
Q55
A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as
  • A Process metric
  • B Product Metric
  • C Test metrics
Answer: Option A
Q56
Check Sheet(Checklist) is considered a simple , but powerful statistical tool because it differentiates between two extremes.
  • A True
  • B False
Answer: Option A
Q57
Application should be stable. Clear Design and Flow of the application is needed for Automation testing.
  • A False
  • B True
Answer: Option B
Q58
Quality plan describes the quality procedures and standards that will be used in a project.
  • A False
  • B True
Answer: Option B
Q59
How severely the bug is effecting the application is called as
  • A Severity
  • B Priority
  • C Fix ability
  • D Traceability
Answer: Option A
Q60
Project Risk affects The Schedule or Resources.
  • A True
  • B False
Answer: Option A